Correct Answer: C: 9
Explanation: The correct answer is C: 9. The International Court of Arbitration set a mandatory minimum flow of 9 cubic metres per second into the Neelum River as an environmental flow requirement, as part of the dispute between Pakistan and India over the Neelum-Jhelum and Kishanganga hydropower projects.